Cable blamed for Hunts blackout

A FAULT in a high-voltage cable was to blame for a power cut that blacked out much of the Huntingdon area for up to 25 minutes last evening (Tuesday).

A spokesman for UK Power Networks (as what used to be EDF Energy Networks has been known since it was sold in July) said today: “Power was interrupted to several thousand customers in the Huntingdon area and surrounding villages from 10.09pm last night (Tuesday).

“UK Power Networks restored supplies in stages, with the final customers having power back by 10.34pm.

“The cause was a fault on a high voltage overhead power line, and we would like to apologise for the inconvenience caused.”


You may also want to watch:


Become a Supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Become a Supporter
Comments powered by Disqus