Roadworks and road closures planned for the week ahead

PUBLISHED: 16:07 17 March 2017 | UPDATED: 16:07 17 March 2017

Archant

Highways England has released a list of roadworks and road closures scheduled to take place on the major roads serving Cambridgeshire over the coming week.

For further information, including changes to planned works, log on to www.highways.gov.uk/traffic.

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

Work to improve journeys on the A14 between Cambridge and Huntingdon continues this week with a variety of tasks underway including the installation of plant-crossing points, site surveys, clearing vegetation and installing CCTV, average speed cameras and information signs.

A14 junction 33 (Milton) to junction 34 (Horningsea), Cambridgeshire: drainage repairs

Work to improve journeys by carrying out drainage maintenance along the A14 continues this week. Lane two will be closed on both carriageways overnight, between 8pm and 6am, from Monday, March 20, for five nights.

A14 Spaldwick: safety fence upgrade

Work to upgrade the verge side safety barrier at the side of the road in two locations around Spaldwick start this week. There will be a temporary 50mph speed limit in place 24 hours a day and at weekends. The slip road at junction 18 (Spaldwick) will be closed from Monday, March 20, for five nights overnight, between 8pm and 6am. Traffic will be diverted to travel to junction 18 and then to return eastbound to junction 18.

A421 Elstow, Bedfordshire: technology installation

Work to improve journeys by installing traffic sensors in the carriageway will take place this week. Lane closures will be in place on the eastbound exit slip road during the day, between 8am and 5pm, on Monday, March 20.

A428 Eltisley, Cambridgeshire; street lighting and road markings

Work to improve journeys by carrying out street lighting maintenance and renewing road markings continues this week. Temporary traffic lights will be in place overnight, between 8pm and 6am, until Friday, March 31.

A1 Georgetown to Sandy, Bedfordshire: resurfacing

Work to improve journeys by resurfacing sections of the A1 southbound takes place this week. The southbound carriageway will be closed between the Black Car and Sandy roundabouts overnight, between 8pm and 6am, on Monday, March 20, for three nights. A clearly signed diversion will be in place via the A421 and A603 following the hollow diamond symbol.

A1 Sandy to Black Cat, Bedfordshire: drainage improvements

Work to improve journeys by renewing drainage on the A1 continues this week. Lane closures will be in place overnight, between 8pm and 5am, from Monday, March 20, for five nights.

A1 Carpenters Lodge, Cambridge: resurfacing

Work to improve journeys by carrying out resurfacing on the northbound slip road starts this week. Access to and from the A1 at the B1140 will be closed, with traffic diverted to the next available junction. The slip road will be closed overnight between 8pm and 6am on Tuesday, March 21, for one night.

More news stories

Fri, 16:00

A group of St Neots parents whose children have been denied places at the Round House School on Love’s Farm are campaigning to secure entry in time for the September intake.

Fri, 13:26

Dozens of homes and businesses in St Neots are now without electricity as engineers work to use restore power.

Fri, 10:02

Competition is set to be fierce at Ramsey Cricket Club this summer as the players aim to raise money for charity using their batting skills.

Fri, 08:00

A 26-year-old who killed a man has been sent back to prison to complete his sentence after being caught driving while disqualified.

Most read stories

Most commented stories

Local business directory

Cambridgeshire's trusted business finder
HOT JOBS

Show Job Lists

Digital Edition

Image
Read the Hunts Post e-edition E-edition

Newsletter Sign Up

Sign up to receive our regular email newsletter